Saturday, June 29, 2013

Swimming Pool Expert Witness Construction and Design Professional

Concrete Slab - Proper Thickness and Placement of Steel Reinforcement

Concrete Slab Thickness

Most structural engineers, building inspectors and contractors do not comply with the published building codes that require minimum slab thicknesses & specific placement of the reinforcing steel. These standards apply to "structural slabs" which are defined as slabs that contain reinforcing steel AND support or transfer loads. Therefore, slabs that bear traffic or weight (e.g. driveways, garage floors, warehouse floors, sidewalk/drive approaches, ANY building slab, etc.) are structural slabs.

The American Concrete Institute (ACI) 318-11 (2011), section 7.7.1 specifies certain slab thickness (dependent upon the thickness of the reinforcement used). It specifies 3 INCHES of concrete between the earth side (regardless if it is soil, sand, gravel, rock or protected by plastic) and 1.5 inches of top coverage - #5 bars (5/8 inch) and smaller, and 2 inches of coverage for #6 - #18 bars (3/4 inch - 2.25 inch).


Remember when determining slab thickness that the bars cross each other - resulting in steel TWICE as thick as a single bar.


Therefore, if you are using #4 bars as reinforcement in your slab, you would have a minimum 5.5 inch slab (3 inches + 0.5 inch steel + 0.5 inch steel + 1.5 inches). Using wire mush is difficult, as you cannot maintain the required placement of the reinforcement within the slab - it bends & deforms too much.


Building Codes - It's the Law!

Don't say that the ACI standards do not apply to your locale.  The ACI Standards are incorporated DIRECTLY into the Uniform Building Code (IBC).  And every state (except Michigan) has adopted the IBC as their base building standard.

IBC 1901.2 states "Plain and reinforced concrete. Structural concrete shall be designed and constructed in accordance with the requirements of this chapter and ACI 318...". 

California has the CA Building Code, which is based on the IBC (as usual, CA just made their code more stringent).  A number of other states have done the same to meet regional issues (CO - wild fire protection, snow loads, FL - Hurricanes & Winds, Tidal Surge Areas, etc.).


Supporting the reinforcement


Contractors are NOT ALLOWED to place the reinforcement on the grade and "hook" it (lift the reinforcement into the slab with a hay hook) as they place the cement. After they lift the reinforcement to an arbitrary level, they walk through the wet cement, pushing the reinforcement back to the bottom - where it does absolutely NOTHING. Additionally, hooking frequently pierces the vapor barrier, rendering it worthless.

Concrete blocks or "chairs" must not be space so far apart, that they allow the reinforcing steel to deflect (bow or bend) during concrete placement or as the finishers walk on it. 

ACI 318-11 7.5.1 states "Reinforcing steel shall be accurately placed and adequately supported before concrete is placed, and shall be secured against displacement within tolerances..." 

IBC R506.2.4 states "Reinforcement support. Where provided in slabs on ground, reinforcement shall be supported to remain in place from the center to upper one third of the slab for the duration of the concrete placement."

Vapor Barriers


The plastic placed under a slab is known as a VAPOR RETARDER. It's sole purpose is to prevent capillary action (wicking of moisture) through the slab if it was allowed to remain in direct contact with the soil. Care must be taken to adequately overlap the plastic sheets, seal the seams with waterproof tape and prevent the plastic from punctures. 

Penetrations (pipes, conduits, vents, etc.) through the plastic sheet must be sealed with special cone shaped plastic sheets similar to roof jacks. Notice that the code said "retarder," not "preventer" or "barrier." Some will allow moisture transmission as they may decay over time.

Sand or soil is sometimes placed atop the plastic to absorb the bleed water on the bottom of the slab. The surface of slabs poured directly on plastic will bleed a lot surface water. The perimeter slabs must be elevated to account for the thickness of this material. The support chairs should sit on this material or be of an extended height to allow for it. 


In some areas of the country, these membranes perform multiple tasks, and are installed to also prevent methane or radon gas transmission into the living space. These membranes are made of special materials, require special seam treatments and incorporate under slab venting. Some systems utilize multiple layers of barriers to achieve the required protection.

IBC 2012 R506.2.3 states "Vapor retarder. A 6-mil (0.006 inch; 152 ï½µm) polyethylene or approved vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the concrete floor slab and the base course or the prepared subgrade where no base course exists.
Exception: The vapor retarder may be omitted:
1. From garages, utility buildings and other unheated accessory structures.
2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and carports.
3. From driveways, walks, patios and other flatwork not likely to be enclosed and heated at a later date.
4. Where approved by the building official, based on local site conditions."


Proper Grading

The IBC also requires that the earth around the foundation fall away 6" in the first 10 feet, to promote positive site drainage away from the foundation. This also helps prevent water from flowing back under the slab, saturating the base material and causing wicking.


"Turndown" footings can also be added to a flat slab to reinforce the edges, transfer loads and to act as a "cut off wall" for ground water intrusion. These are already incorporated into building foundations as part of the designed load transfer.



Concrete Strength

Though the codes specify 2,500 PSI as the minimum strength for concrete foundations, there are significant benefits and little added cost from using 5000+ PSI concrete.  Added strength, durability,  wear resistance and reduced permeability are all achieved by merely increasing the strength.  Larger aggregates also increase the concrete strength. Most contractors utilize 3/8" aggregate in concrete, because the cost of pumping is a little lower.  3/4" rock is preferred (and is specified by most State Highway Departments), as it yields higher compressive strengths. A 3/4" aggregate and 5,000+ PSI mix and a 3/4" concrete pump is worth the return on your investment.  There is a significant return on the investment of a few thousand dollars.



Concrete Mix Design - Minimizing Water

Most contractors, pump operators and cement truck drivers do not understand "concrete science." 
Concrete only needs enough water to hydrate the cement particles.   

Water makes concrete weaker, by creating microscopic voids in the matrix of the concrete.  When the water evaporates, it leaves microscopic honeycombs behind - weakening the concrete.  

There are "water reducers," super plasticizers and other chemical admixes can reduce the ACTUAL water content required.  They increase the strength, while maintaining the flowability, pumpability and workability of the plastic concrete.  If your concrete contractor or ready-mix supplier does not know about these, find someone else (they have been around for decades!).

AND ABOVE ALL -

DO NOT let the concrete pump operator or cement truck driver add water when the truck arrives at the job site.  By adding water they just weaken your cement, adultering the formulation and mix design!  They are truck drivers and pump operators for a reason... because they are not engineers or concrete/building experts.

Your structural engineer or ready mix plant "mix master" should specify the mix design, based upon strength required, truck travel time, weather conditions, distance to pump & pump type, etc.  They can provide an "allowance" for the addition of some extra water, to be specified in measured gallons.

Paolo Benedetti Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Sunday, June 23, 2013

Swimming Pool Designer Expert Witness VGB Unblockable Drains

There has been a lot of confusion about VGB compliant BLOCKABLE & UNBLOCKABLE DRAIN COVERS.  

While the following national standards pertain to public/commercial pools, we advocate the same standards for residential vessels.  We do not discern a difference between the requirement for a safe hydraulic standards of private VS public/commercial vessels.  We feel that private pools should be just as safe as commercial pools when it comes to suction entrapment and safety.  After all, there are many more private pools than public pools on this planet!
 

While the MAXIMUM INDUSTRY STANDARDS allow 6 FPS, we advocate and promote a MAXIMUM SUCTION LINE VELOCITY OF 4 FPS IN THE TRUNK LINE and 2 FPS MAXIMUM THROUGH A BRANCH SUCTION LINE OR A DRAIN INLET (1 FPS when 1.5 FPS is the maximum standard).


First, let's start with an excerpt from a channel drain cover installation manaul:
 

WATER VELOCITY AND FLOW RATES -
The maximum water velocity through drain covers is limited by some local regulations, for example some state health departments limit the velocity through public pool drain covers to 1½ feet per second. This velocity limit is lower than the flow rating provided by the ANSI/APSP-16 2011 certification, therefore the local limit applies and must be followed. Never exceed the flow rating listed on the cover even if the local code does not provide a velocity limit.


PIPING – GENERAL
For new installations, the piping between drains must be sized to limit the velocity to six feet per second. This limit applies to the
branch piping and all fittings between multiple outlets and the tee leading back to the pump. If code requires a lower water velocity,
comply with the code. See the chart below for information on pipe size flow ratings at six feet per second.


HYDRAULIC SYSTEM SPECIFICATIONS -


ACCEPTABLE PIPE SIZE FOR MAXIMUM RECOMMENDED SYSTEM FLOW RATE PER APSP-7 (6 feet/second in the branch line):
Pipe Size                    1½"  2"   2½"   3"   4"
Flow Rate in GPM    45    80   110   160  230 (rounded down)

This is where the confusion lies - blockable drains & un-blockable drains and the relationship of line velocities.

First, Blockable drains:
 

Though a drain cover may be rated for 10,000 GPM, it is REALLY limited by the MAXIMUM LINE VELOCITY of the attached pipes.  On dual drain systems, in the event one drain is blocked, the REMAINING lines must be capable of sustaining 100% of the flow BELOW the 6 FPS maximum.  This means, that during normal operation the flow rate through a "blockable drain" must be 3 FPS or less (when a drain becomes blocked the line velocity through the remaining drain will double). 

BLOCKABLE DRAIN EXAMPLES:

1)  A pump is connected to a 4" trunk line, which is split into (2) 3" branch lines. The 4" line flows 234 GPM @ 6 FPS, while the 3" branch line flows 68 GPM @ 3 FPS. 68 GPM X 2 = 136 GPM.  The maximum flow rate of that system is 136 GPM.  When one drain is blocked the maximum line velocity of the remaining 3" branch line is limited to 136 GPM - therefore that is the MAXIMUM to be drawn through the 4" trunk line.

2)  A pump is connected to a 4" trunk line, which is split into (2) 4" branch lines. The 4" line flows 234 GPM @ 6 FPS, while the 4" branch lines flows 117 GPM @ 3 FPS.  The maximum flow rate of that system is 234 GPM.  When one drain is blocked the maximum line velocity of the remaining 4" branch line is limited to 234 GPM @ 6 FPS - therefore that is the MAXIMUM that may also be drawn through the 4" trunk line as well.

To select a compliant cover, one would merely select a drain cover that is equal to or above the above GPM flow rate at 3 FPS.  If the local standard was 1.5 FPS through the cover, they you'd look for a cover with 2X the GPM flow rating of the above system maximums.
 

THEREFORE, for blockable drains, the maximum line velocity at the pipes connected directly below the cover are limited to 3 FPS maximum (or lower).  In communities with 1.5 FPS standards, the plumbing would have to be split again or upsized to get to 1.5 FPS.

Now, onto UNBLOCKABLE DRAINS:

They are rated using TWO CRITERIA: GPM @ FPS.
Most states limit the FPS flowrate through an UN-BLOCKABLE COVER TO 3 FPS. 
Some states (Texas for example) have lowered the FPS through un-blockable covers to 1.5 FPS.
The rating for an un-blockable cover will look like this: 300 GPM at 3 FPS.
So, if you draw 600 GPM through the cover, the line velocity would be 6 FPS - exceeding the rating of the cover.  150 GPM through the cover, would bring the line velocity down to 1.5 FPS (to comply with states that have de-rated such covers).
 

UN-BLOCKABLE DRAIN EXAMPLES:

1) An un-blockable channel drain is rated at 300 GPM @ 3 FPS.  It is connected to a 4" trunk line, that is split into (2) 2.5" branch lines.  The 2.5" branch lines are connect to 2 inlets on the bottom of the channel drain.
Consider the various maximum limits:
4" pipe: 234 GPM @ 6 FPS
2.5" pipe: 88 GPM @ 6 FPS
Un-blockable Drain Limit: 300 GPM @ 3 FPS
The line velocity of the attached 2.5" pipes are the limiting factors @ 88 GPM each X 2 = 176 GPM.
The maximum flowrate of this system is 176 GPM.

2) An un-blockable channel drain is rated at 300 GPM @ 3 FPS.  It is connected to a 4" trunk line & manifold, that is split into (3) 2.5" branch lines.  The 2.5" branch lines connect to 3 inlets on the bottom of the channel drain.
Consider the various maximum limits:
4" pipe: 234 GPM @ 6 FPS
2.5" pipe: 88 GPM @ 6 FPS
Un-blockable Drain Limit: 300 GPM @ 3 FPS
Though the line velocity of the (3) attached 2.5" pipes would allow 264 GPM (e.g. 88 GPM each X 3 = 264 GPM), that would exceed the maximum line velocity of the 4" trunk line at 234 GPM. 
The maximum flowrate of this system is 234 GPM @ 6 FPS.

3) An un-blockable channel drain is rated at 300 GPM @ 3 FPS.  It is connected to a 4" trunk line & manifold, that is split into (2) 2.5" branch lines.  The 2.5" branch lines connect to 2 inlets on the bottom of the channel drain.  However, the local authority's standard specifies 1.5 FPS for un-blockable drains.
Consider the various maximum limits:
4" pipe: 234 GPM @ 6 FPS
2.5" pipe: 88 GPM @ 6 FPS
Un-blockable Drain Limit: 150 GPM @ > 1.5 FPS < (a slower standard).
Though the line velocity of the (2) attached 2.5" pipes would allow 176 GPM (e.g. 88 GPM each X 2 = 176 GPM), that would exceed the maximum rating of the un-blockable cover at 1.5 FPS of 150 GPM. 
The maximum flowrate of this system is 150 GPM. 
Sidenote: the trunk line could not be downsized to 3", because 150 GPM would exceed 6 FPS in a 3" pipe.

4) An un-blockable channel drain is rated at 316 GPM @ 3.9 FPS when floor mounted.  It is connected to a 4" trunk line & manifold, that is split into (3) 2.5" branch lines.  The 2.5" branch lines connect to 3 inlets on the bottom of the channel drain.  However, the local authority's standard specifies 3 FPS for un-blockable drains (therefore, we must solve for the GPM rating at 3 FPS).
Consider the various maximum limits:
4" pipe: 234 GPM @ 6 FPS
2.5" pipe: 88 GPM @ 6 FPS
Un-blockable Drain Limit: XXX GPM @ > 3 FPS
316 GPM ÷ 3.9 FPS = 81 GPM/1 FPS
81 GPM X 3 GPM (our standard in this case) = 243 GPM @ 3 FPS
Though the line velocity of the (3) attached 2.5" pipes would allow 264 GPM (e.g. 88 GPM each X 3 = 264 GPM),
and the limit through the drain cover would allow 243 GPM @ 3 FPS,
BOTH OF THOSE FLOWRATES would exceed the maximum line velocity of the 4" trunk line at 234 GPM. 
Therefore, the maximum flowrate of this system is 234 GPM @ 6 FPS.
 

Note the differences in line velocities of the piping attached to bloackable VS un-blockable drains:

Blockable Covers: 

The maximum line velocity at the pipe connected below the cover is limited to 3 FPS.
Un-blockable Covers: 

The maximum line velocity at the pipe connected below the cover is limited to 6 FPS.

While these are the MAXIMUM INDUSTRY STANDARDS, we advocate and promote a MAXIMUM LINE VELOCITY OF 4 FPS IN THE TRUNK LINE and 2 FPS MAXIMUM THROUGH A BRANCH LINE OR A DRAIN INLET (1 FPS when 1.5 FPS is the maximum).
 

Hopefully, through these examples, you have come to realize that JUST BECAUSE A COVER HAS A MANUFACTURER'S "FLOW RATING," it is the ATTACHED PIPING SYSTEM THAT DICTATES the MAXIMUM GPM through a plumbing system.
 

Paolo Benedetti 
Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Tuesday, June 11, 2013

Swimming Pool Designs must be ADA Compliant

Expert Witness - Swimming Pool & Spa, Americans with Disabilities Act

The ADA requires that swimming pools be designed to allow a person with disabilities to enter and exit the swimming pool or spa, on their own and without the assistance of others.

This is easily achieved through the installation of a lift.  Lifts are electric, hydraulic or battery powered.  They must be in place and available for use at all times.  They are UGLY and can potentially become an obstruction on the pool deck, in violation of other portions of the ADA.

The alternative is an innovative design, that allows the person with disabilities to walk or roll right into the water.  It is a ramp or beach entry, that gently slopes into the water.  This is aesthetically pleasing and a creative solution to the hideous deck mounted chair or sling lifts.

 
Paolo Benedetti 
Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Tuesday, April 23, 2013

International Swimming Pool Designer and Builder

Swimming Pool Design and Construction Plans - What needs to be included in a BASIC set of plans?

Minimum Inclusions:
Scaled Site Plan 
Erosion Control Plan (Storm, Waste Water and Run-off Control Plan - Federal Requirements: http://cfpub.epa.gov/npdes/stormwater/const.cfm )
Grading Plan
Drainage Plan
Soils Report
Structural Engineering
Soils Engineer Approval Letter (review of structural engineering)
Project Layout
Project Cross Sections  (depths, stairs, ramps, etc).
Plumbing Schematics 
Hydraulic Calculations (line sizes, velocities & flow rates) 
Equipment Model and Part Numbers
Lighting Schematics
High Voltage Electrical Schematics (site & equipment pad)
Low Voltage Electrical Schematics (data, automation, temperature sensors, etc). 
Spa Seating Elevations & Jets Layout/Elevations
Design Details (plan & section views)
Equipment Pad/Room Layout (to scale)
Equipment Room Electrical (high & low voltage)
Materials List (major components)
Construction Specifications
Applicable Codes and Standards

Optional:
Finish Materials (Stone, tile, plaster, stucco, wood, etc.)
Materials Specifications
Installation Mock-ups & Samples
Installation Procedures
Workmanship Standards
Shop Drawings for Custom Fabricated Components
Gray Water Storage and Recycling

Gone are the days when a pool could be built with 2 pages of plans - a site plan and one page of generic mail-order structural engineering. 

Paolo Benedetti 
Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Sunday, April 14, 2013

Famous Swimming Pools Designer Consultant

 10 Common Mistakes when designing a swimming pool

1.  Short Term Savings, Long Term Loss

To save a few dollars on the bottom line, pool designers do not specify a "dedicated pump for a dedicated purpose."  In other words, they over size the main filter pump so that they can power more options.

By operating an over sized filter pump, more electricity is consumed than is actually needed for merely filtering the pool.  The excess line velocity through the plumbing damages heaters, salt chlorine cells and other apparatus.

Multiple skimmers also result in a cleaner pool.  The fact is, there are more inlets for the debris to be collected.  An over sized filter can (depending on the type) result in fewer cleanings and reduce the maintenance costs.  An automated chemical delivery system can keep the water chemistry perfectly balanced - the pool is always ready for use.

2.  Not Specifying Color Coordinated Fittings

It is simple to specify fittings to match the finish color of the pool.  Many manufacturers make eyeball fittings, main drains, channel drains and skimmers in a multitude of colors.

There is SOMETHING out there that will blend in with your project.  It is not "WHITE OR NOTHING," that is pure laziness on the part of the builder.

3.  Not installing an auto-fill or over-flow line

Face it, people are busy.  Attending to the water level in the pool is the last thing on their mind.

Low water levels result in pump damage or in the case of VFD pumps - self protection shut-down.  Imagine your pool without filtration in the heat of the summer!

During the winter months rain can quickly cause the water level to flood skimmers, rendering them ineffective.  Debris from winter storms and winds will sink to the bottom.  High water levels can also damage copings and mortar beds.

4.  Failing to install a pressure side cleaner line

Even though a client may not desire a pressure side cleaner, the plumbing line and booster pump should be installed for the service company.  A cleaner booster pump combined with a "leaf bagger" cleaner will accelerate the clean up of bulk debris from the floor of the pool after winter storms.  Garden hose pressure is insufficient to properly and effectively power a bag leafer.

5.  Failing to install a dedicated vacuum line on a detached spa 

If the spa is not attached to the pool or is more than 30 feet away from the closest skimmer, then a dedicated vacuum line is needed.  This is much like a "central vacuum" port that allows for the simple collection of sand and silt from the bottom of the spa.

6.  Not installing automated controls on a pool / spa combination

It is simply foolish not to install even a simple automation system on a pool &amp; spa that share a common filtration and heating system (e.g. spill over spa).

Automation allows the owner to activate the heater, check the temperature and turn the valves in the proper sequence - all from within the house.

Failing to cool the heater down before turning off the filter pump can damage the heater.  Sequencing the valves in the wrong order  
can drain the spa, dead-head the pump or cause the pump to run dry.  Many people are confused by the valve's proper positioning and sequencing and end up damaging their systems.

Automation has become affordable, so the point of being a necessity on every pool and spa combinations.

7.  Failing to install adequate deck drainage

Allowing the decks to drain off into the planters merely allows the water to seep back under the decks and percolate into the sand/rock under the concrete.

This can cause corrosion issues with the pool reinforcement steel, cracking of the pool from saturated soil surcharges, or deck heaving or settlement.  It can also create efflorescence issues with the pool deck, coping and tile.  On sloping lots, this run-off can even undermine a slope, cause mudslides or the pool to slip down the incline.

It is best to collect the surface water and direct to an appropriate discharge point away from the pool.

8. Allowing a "Pool Salesman" to specify the project

A pool salesman works on commission.  Your interests are not his.  His job is to sell you as much as possible for the highest possible price.

Few salesmen have the requisite training to specify the correct plumbing and pump sizes or to calculate proper system hydraulics.

9.  Installing a single light in the deep end

Installing a single twelve inch round cheap looking motel light in the deep end is the silliest thing you can possibly do.

Installing a few more smaller sized lights on the wall facing away from the house (or vantage point) will result in a pool that is more evenly lit.  It will also mean that you're not looking directly into a truck headlamp whenever the lights are on.
 
10.  Hiring the Lowest Bidder

For some reason, consumers have been led to believe that they need to collect 3 bids and then select the lowest one.  In today's economic climate, you simply will not get the best possible project for the least amount of money.

The best for the least?  Come on - that's common sense.  But millions believe this to be true. 

REMEMBER - You get what you pay for! 
 
Paolo Benedetti - Aquatic Artist 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Paolo Benedetti 
Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Saturday, April 13, 2013

International Swimming Pool Construction Consultant

International Swimming Pool Construction Consultant and Expert Witness discusses why a vanishing edge swimming pool requires a dedicated edge pump and filter.

Cleanliness

The edge of an infinity pool functions as a gigantic skimmer weir.  A normal pool with in-wall skimmers only has 8 INCHES of skimmer weir (per skimmer).  A vanishing edge pool may have 20 to 50 FEET of skimming weir. 

When the pool is in the "spill-over" mode, all of the debris in the pool flows over the edge.  This explains why the catch basin is always full of leaves, bugs and dirt.  The infinity edge is actually a gigantic weir skimming the surface debris.

Without a dedicated filter on the vanishing edge pump this debris would be ground up and recirculated into the upper pool.  A negative edge pool without a filter on the edge pump turns cloudy the instant this debris is blown back into the upper pool.

Who wants to swim in a cloudy pool full of ground up bugs, worms, tree frogs and leaves?

Energy Efficiency 

Filtration of the pool can usually be performed with a small energy efficient pump.  Usually a 1/2 to 1 horsepower pump is sufficient.  Large volumes of moving water are not necessary.  Water clarity is improved at slower velocities with longer filtration cycles (longer run times).

The pumps required to create the "flooded edge" effect are usually much larger than what is required to merely filter the pool.  Pumps of 2 to 5 horsepower are not uncommon.

To design a vanishing edge pool, that combines the edge pump and primary filtration system into one system is foolhardy.  Though $5,000 - $7,500 might be saved on the initial project cost, the expense of operating this larger pump to filter the pool will quickly exceed any initial cost savings.

The edge pump really only needs to operate for two hours daily, when the pool is in use or when the flooded edge effect is desired.  Therefore excess energy will be consumed daily, to merely achieve the necessary filtration turnover rate.
 
Don't step over dollars to pick up pennies!


Paolo Benedetti 
Aquatic Artist, Watershape Consultant, Expert Witness 
"Creating water as art."™ 
Aquatic Technology Pool and Spa 
©www.aquatictechnology.com

Tuesday, April 9, 2013

Famous International Swimming Pool Designer Watershapes Consultant

What standards apply to Overseas or International Aqua Designs?

Most European Union member countries have adopted the ISO standards.  However those standards do not address a multitude of construction, design and safety issues that have been addresses in the United States Building Codes.

International Building Code

The IBC is THE building code across the Unites States (except Wisconsin).  The IBC had incorporated the ANSI/NSPI/APSP standards as well as related construction standards.

Therefore, the IBC should be a basis for defining the standards on an international project, where local codes do not address a particular issue. 

International Swimming Pool Code

APSP has released an International Swimming Pool Code.  While not all encompassing, it is also a good BASIC starting point.  It is generic in many of the areas it addresses, because it refuses to establish a minimum level of acceptable workmanship.  Where it does establish a criteria, this should be only be a "not to exceed" standard.

Read a copy of the 2012 International Swimming Pool & Spa Code here:
2012 International Swimming Pool & Spa Code